Iso Ts 220024 — Checklist Top

“From now on, we always start at the top.”

ISO/TS 22002-4 (now being superseded by ISO 22002-4:2025 ) provides the essential framework for in the manufacturing of food and feed packaging. This technical specification is a critical component for organizations seeking FSSC 22000 certification , as it bridges the gap between general management systems and the specific hygienic requirements of a packaging plant. Core Checklist Requirements

: Are there documented procedures for waste removal and drainage? Equipment Suitability

| Area | Non-Conformity | |------|----------------| | Compressed air | No microbial testing or filter changes recorded | | Inks & adhesives | Missing migration data for low-contact surfaces (e.g., bag-in-box outer layers) | | Maintenance | Temporary repairs (tape, wire) left for >48 hours | | Personnel | Operators wearing personal gloves from home (no proof of food-grade) | | Traceability | Mixed scrap recycling bins causing rework contamination | iso ts 220024 checklist top

Equipment engineering must prevent the accumulation of residual grime and chemical lubricants.

Are doors, windows, and loading docks sealed tight against pest entry?

Do employees wear clean, designated uniforms, hair restraints, and beard covers? “From now on, we always start at the top

Ensure restrooms and breakrooms are physically separated from production zones. 🛠️ Operational Controls

While they are often used together, they serve different functions in a Food Safety Management System (FSMS). ISO 22000:2018 ISO/TS 22002-4 High-level management and HACCP principles Specific technical PRPs for packaging Applicability Entire food supply chain Packaging and intermediate products only Detail Strategic (policy, leadership, planning) Operational (hygiene, layout, sanitation) Role The core management standard A supporting document for PRP compliance Steps to Implementation

Are local activities evaluated for potential contamination risks to the packaging site? and solvents stored in secured

Are chemicals, ink waste, and solvents stored in secured, designated areas? 5. Equipment Suitability, Cleaning, and Maintenance

A robust audit checklist must mirror the structure of the technical specification. It should cover everything from infrastructure design to product recall procedures. 1. Establishment and Infrastructure

: Any product intended for reprocessing (rework) must be clearly labeled and traced. A robust withdrawal procedure is necessary to handle non-conforming batches.

Are cleaning methods validated to prove they achieve the required level of cleanliness?

“Good morning. I’d like to start with the ‘top management checklist’—clause 7. Leadership and commitment.”